Evidence your investors can check.

Bricks is the system that brings it all together: dated site visits, progress reports and investor updates for every project you fund or own.

Drone still of a concrete podium at formwork stage
I-00Podium at formwork stage, drone stillFrom our photo library

One system, every visit.

Every visit to a site lands on one dated timeline. Reports and updates are drafted from it, so what you send matches what was captured.

Over time, not just today.

The same project file gives you progress, measurements and what changed since the last report.

  1. I-01

    Progress reports.

    Pick a date range and Bricks drafts the report from your dated visits: true maps, before and after, milestones and what changed since the last report. Each edit is saved as a new revision, with a change log.

    • Download it as a PDF, or share a read-only link that expires
    • Scale bars and photo location pins on every true map
    • A scope line on every report: visual documentation of site conditions, not a cost, quantity or completion certification
    The top of a Bricks progress report with sample data: project, date range and an orthomosaic with a scale bar and two photo location pins
    Sample data
  2. I-02

    Evidence you can check.

    Lenders and quantity surveyors get dated, measured evidence they can check. Every file in the evidence index carries a SHA-256 checksum.

    • Weather for each visit from NASA POWER, modelled for the site
    • Capture details for each visit: aircraft, height, ground sample distance, and pilot certificate and ground control where recorded
    The evidence index of a Bricks progress report with sample data: dated orthomosaics, point clouds and stills, each with a SHA-256 checksum, file name and size
    Sample data
  3. I-03

    Investor updates.

    A monthly update on the same engine. Each one starts from the last, so what changed is already written. Add your schedule, budget, next steps and risks.

    • Schedule and budget figures stay marked as yours
    • Same PDF and expiring link as a progress report
    The schedule and budget section of a Bricks investor update with sample data: change since the last update, target and forecast dates, budget, next steps and risks
    Sample data
  4. I-04

    3D compare.

    Put two dates side by side, or show only what changed. Bricks measures fill, cut and the area changed between two point clouds.

    • Measured on a 0.5 m grid, coarser on very large sites; changes under 10 cm are left out
    • An estimate for tracking progress, not a survey
    Bricks comparing two point clouds of a sample site a month apart, with raised areas in orange and fill, cut and area changed measured below
    Sample data

Getting reports from a builder?

You don't need an account to read one.

Two workers in hi-vis among reinforcing steel on a concrete deck
Representative image

REITs and leasing teams.

A leasing account keeps each building’s units next to its site progress.

Your team updates unit status in Bricks. It doesn’t sync with a leasing or property management system yet.

Create a REIT accountBricks for REITs

One vendor. One portal. Dated evidence for every draw.

Per visit, or per site each month.

All prices
Progress visit
$495
Mapped capture
$1,499
Monthly plans from, per site
$450

Plans are billed monthly per site, month to month. Mapped plans add the one-time $650 setup. Survey-grade accuracy is quoted separately. CAD, plus HST.

Portfolio watch for properties you hold: a dated aerial and roof check compared with the last visit, $195 a month per property, billed $585 a quarter, or $450 a month per property for a monthly visit. CAD plus tax, in your investor account. Acquisition captures are $1,250, or $2,250 mapped, booked online. Your account compares the baseline with the latest visit and builds an insurance claim pack from the records either side of a date of loss.

Need a site captured first?

Book a site visit